Design of operation of a new 120 MW Maloměřice heating plant power source in E.ON 110 kV power distribution network
Janda, Petr ; Vaculík, Petr (referee) ; Blažek, Vladimír (advisor)
Before putting new power distribution installation into operation and before the connection to grid is needed to validate connectivity of the installation. Purpose of verification is to check compliance with the technical conditions of relevant regulations. Ones of the most important conditions include compliance with the prescribed connection voltage tolerance at the connecting device – and even in the worst-case – and provide necessary short-circuit capability of the other devices in a connected grid. Main task of my master’s thesis is just checking that the voltage tolerance and the control of short-circuit resistance. The calculations were performed by using the dispatching control system that works with the current parameters of the distribution system equipment 110 kV. Theoretical part of thesis describes two main points of the method of calculating the network operation and the method of calculating short-circuit conditions. Based on these theoretical processes are relevant input data processed and evaluated in the dispatching control system. The calculation and evaluate results are presented in the final part of the master’s work.
Design of operation of a new 120 MW Maloměřice heating plant power source in E.ON 110 kV power distribution network
Janda, Petr ; Vaculík, Petr (referee) ; Blažek, Vladimír (advisor)
Before putting new power distribution installation into operation and before the connection to grid is needed to validate connectivity of the installation. Purpose of verification is to check compliance with the technical conditions of relevant regulations. Ones of the most important conditions include compliance with the prescribed connection voltage tolerance at the connecting device – and even in the worst-case – and provide necessary short-circuit capability of the other devices in a connected grid. Main task of my master’s thesis is just checking that the voltage tolerance and the control of short-circuit resistance. The calculations were performed by using the dispatching control system that works with the current parameters of the distribution system equipment 110 kV. Theoretical part of thesis describes two main points of the method of calculating the network operation and the method of calculating short-circuit conditions. Based on these theoretical processes are relevant input data processed and evaluated in the dispatching control system. The calculation and evaluate results are presented in the final part of the master’s work.